A→PAppToProdLAUNCH OPS
Home / Guides / First seven days after launch
FIELD GUIDE

First seven days after launch

Review errors, conversion, support, costs and failed jobs.

Implementation order

  1. Assign an owner.
  2. Separate preview and production.
  3. Configure the smallest safe baseline.
  4. Test expected and failure paths.
  5. Document evidence and rollback.

Evidence standard

A builder-generated screen or successful demo is not proof. Verify the deployed configuration, a real non-admin user flow, alerts and recovery behavior.

Run readiness check →